Creative Hourly / The smallest block

What five hours
actually clears.

The honest answer, with real timings from real client work, so you can decide whether $250 is worth it before you spend it.

Clear My Backlog

Five hours is $250. Ten is $500. See all blocks.

01 / A real one

1 hour 32 minutes,
measured.

In one live session for a practitioner in Asheville we rebuilt her main practice page from her own writing, updated a second page, started a training page that launched two days later, aligned the site palette, and produced three custom visuals including a system diagram.

That was under a third of a five hour block. See the whole session.

02 / Realistic scope

What tends to fit
inside one block.

Websites

A page, properly.

One substantial page rebuilt or built new, plus the small fixes around it. Or four to six smaller updates across an existing site.

Brand and print

A small set.

A flyer plus social sizes, or a two to four page brochure laid out from copy you already have.

Documents

A deck or a guide.

A ten to fifteen slide deck rebuilt from your notes, or a workbook formatted and exported properly.

Video

A short set of cuts.

Two or three short vertical edits from footage you already own, with captions and an end card.

Operations

A backlog of admin.

Spreadsheet cleanup, records matched to evidence, a Notion workspace set up, an intake workflow built.

Technical

The stuck things.

Broken forms, redirects, mobile layout problems, a handful of small bugs that have been sitting for months.

03 / What it does not do

Where five hours
runs out.

  • A whole website

    A full multi page build is a bigger block or several. We will tell you that before you buy, not halfway through.

  • Hundreds of records

    Large data or archive jobs are real work at real volume. Five hours proves the process and shows you the rate.

  • Anything needing a specialist

    If a job needs a skill outside what we do well, we say so and help you find the right person instead of learning on your money.

When a block will not cover what you have asked for, that conversation happens at the start. It is the single most useful thing we can tell you.

04 / How the time is counted

Production only.
Nothing else.

Counted

Work on your project.

Time spent building, writing, editing or fixing your thing, whether it is Will or an AI assistant under his direction.

Not counted

Waiting and our mistakes.

Slow tools, failed runs, retries caused by us, our internal admin, or time spent learning our own software.

Counted once

One task, one clock.

If Will and an assistant work the same task at the same time, that time is counted a single time.

You get a report every working day showing each task, who worked it, how long, and the balance left. See what a report looks like.

Send the list.
We will tell you what fits.

No obligation in telling us what is stuck. If five hours will not cover it, we would rather say so now.

Clear My Backlog